Quality assurance
We can do:

• Independent checking of Design documents
• Independent checking of Design input document
• Independent checking of Engineering assumptions
• Independent Design review

Our philosophy is that to much good work is waste since the problem has not been defined properly. Sometimes the cause can be so simple that the wrong input revision has been used for final design in a Concurrent Engineering process. In many case the engineering assumptions are reviewed much less than the engineering details. Most failures are caused by the first. A correct definitions of e g loads acting on a structure can be more demanding than the stress analysis itself.